Fall Green's Aeration

Green's core aeration with heavy topdressing was completed today despite receiving over an inch of rain last night.  All 18 holes will be open tomorrow (Wednesday, September 28) for regular play.  The extended forecast looks good to aid with a quick recovery. 
 



Saturday, September 17, 2016

Fall Range Practice Tee Activity Update

It's that time year again for over-seeding of the range practice tees with ryegrass.  This process will be completed the last week of September.  After seed has been dropped, all range practice tee activity will need to take place on our new TurfHound artificial surface for several weeks.  This period without foot and cart traffic will allow for optimum germination and establishment of the seed.  Activity on the over-seeded tees will resume in late October after the third or fourth mowing.  The lower and short game practice tees will be opened next week during this year's Member-Guest.  

The short game practice tee below the Practice Green will be utilized as a helicopter ride landing pad tomorrow afternoon for several hours(member birthday party).  All practice tee activity for the afternoon will be setup for use with reduced number of stations on the left side of the upper practice tee. Practice green activity will continue tomorrow afternoon, with chipping only from the cart path side.  Please enjoy tomorrow afternoon's excitement safely and smartly.  


Monday, August 22, 2016

Greens Topdressing

First light Topdressing on greens with new Toro equipment.  Great improvement with productivity of process and future increased frequency.  Remote control for spreader operation allows for adjustments of belt, spinner, and vibratory output.  



Friday, August 12, 2016

Feast or Famine

This summer has dealt extreme challenges for overall turf quality on the course with above normal temperatures and drought conditions.  The pictures below represent the positive effects(on fairways and rough) of almost 2 inches of rain over the past weeks.  Recovery of greens will become more noticeable as September approaches with lower dew points, humidity, and night-time temperatures.  






#18 Fairway(08/04/16)



#18 Fairway(08/11/16)

Thursday, July 28, 2016

New Sod

Installation of Zorro Zoysia sod on the Back and Member tees on hole #2 completed today.  

Monday, July 25, 2016

Course Sod Work

Sod removal and surface preparation of the Back and Member tees on hole #2 began today.  New Zorro Zoysia sod(same as the range targets) will be installed over the next week.  A temporary tee in front will be utilized during the grow in period over the next month. 


Thursday, June 16, 2016

Driving Range Cart Path Install

The main range tee cart path installation was completed today.  See pictures below of process.  Installation of concrete for tee line, curbing, and stamped areas will proceed through next Tuesday.  Cart access on the new concrete will be available by next weekend.  During this critical time of concrete curing, please continue to utilize the detour route behind #18 Green for all traffic.  Thanks to all for your patience during this time of inconvenience.